Archive for the ‘Blog’ Category

Chipping Away

0829-closets
Aug 30, 2012

On the second and third floors, the plaster has been removed to reveal nothing but bricks, mortar, and wood. Three windows, three piles of rubble. Where will people make calls when the phone booths are gone? Future manny pad. The process continues on the first floor. Until next time…

Read more

New and Old

newwalls
Aug 24, 2012

New roofing (above, permanent), new flooring (below, for construction) New stairs (above, for construction) Old walls (revealed) Old stairs (removed)

Read more

Post Demolition

demo2
Aug 17, 2012

The general cleanup has ended and demolition has begun. Above: Non-weight-bearing walls are being removed on the first floor. Below: When the walls are gone, the curved corners will go, too. So will the shoe repair gear.

Read more

Rooftop Views

roof3
Aug 16, 2012

The demolition process has allowed access to the rooftop and some spectacular views.

Read more

Amy Bodek – Director of Development Services for the City of Long Beach

amy5
Aug 15, 2012

Amy Bodek is the Director of Development Services for the City of Long Beach. I met the former Bostonian at the It’s a Grind coffeehouse (on the always bustling corner of Pine and 3rd, right around the corner from the Psychic Temple) to talk about her impressions of and relationship with Downtown Long Beach as […]

Read more

New walls, new graff

newgraff3
Aug 7, 2012

Brand new walls are being erected outside the Psychic Temple and word is getting out. Some tagger named Caution is already all over the place.

Read more